<big id="pyd37"></big>

  1. <tr id="pyd37"><span id="pyd37"></span></tr>

      <kbd id="pyd37"></kbd>
      <abbr id="pyd37"><form id="pyd37"></form></abbr>
            <u id="pyd37"><th id="pyd37"><em id="pyd37"></em></th></u>
            久久午夜私人影院,天堂中文8资源在线8,国产精品成人久久电影,国产午夜福利精品片久久,日本精品不卡一二三区,免费国产一区二区不卡,国产精品亚洲一区二区三区喷水 ,在线a亚洲老鸭窝天堂
            Information
            Hot
            Contact us
            Shanghai Youpeng Electromechanical Equipment Manufacturing Co., Ltd.
            Fax: 021-69024199
            Contact: Mr.Peng 
            Mobile: 15021113195
            E-mail: 502752248@qq.com
            Address: No. 999, Zhongfa Road, Zhujing Town, Jinshan District, Shanghai
            http://www.bbbjiz.cn/

             

            Hunan Peng bathroom safe choice
            Your location:Home>>industry

            11 points that must be paid attention to when installing the transformer

            Release date:2018-12-20 17:13:54

            11 points that must be paid attention to when installing the transformer


            1. Reasonably choose the installation location of the distribution transformer:
            The installation of the distribution transformer should meet the requirements of the user's voltage, and try to avoid installing the distribution transformer in the barren hills, which is vulnerable to lightning strikes and away from the residential area. This is not convenient for the maintenance personnel to maintain regularly, and it is not convenient for the staff to manage. .
            2. Reasonably choose the capacity of the distribution transformer
            It is also very important to choose the capacity of the distribution transformer reasonably, which can not cause the load of the distribution transformer to burn out, nor can it cause the waste of the big horse-drawn trolley type. According to the user load situation, the capacity should be counted and the distribution transformer capacity should be reasonably selected.
            3. Strengthen the measurement of power load
            During the peak period of power load, the load of each distribution transformer should be strengthened. If necessary, increase the number of measurements. The distribution transformer that does not meet the three-phase current should be adjusted in time to prevent the neutral current from being too large and easy to blow the lead. Causes the user equipment to burn out.
            4. Avoid installing a low-voltage metering box on the distribution transformer.
            The low-voltage metering box installed on the distribution transformer station area of ??the remote mountainous area should be gradually removed, and changed to indoor installation as much as possible.
            5, reasonable allocation of distribution transformer high and low temperature melting point electrical melting
            The melt distribution of the high and low voltage fuses of the distribution transformer is unreasonable, which may cause serious overload of the distribution transformer and burn out the distribution transformer. The high and low pressure melt configuration shall be followed by: a fuse body with a capacity of 100 kV·A or less and a fuse body with a rated current of 2.0 to 3.0 times; and a transformer with a capacity of 100 kV·A or more with a melt of 1.5 to 2.0 times the rated current; The low-voltage side fuse should be configured slightly larger than the rated current.
            6, should not adjust the tap changer privately
            Due to the difference in power load between winter and summer, the voltage level is slightly different. In order to meet the voltage demand, some rural electricians randomly adjust the tap changer without performing related tests, causing the tap changer to be out of position, causing phase-to-phase short-circuit and burnout. Electric transformer.
            7, distribution transformer high and low installed insulation cover
            In order to prevent natural disasters and external damage, if necessary, install high and low voltage insulation covers for the narrow roads and forest protection areas to prevent the low voltage short circuit from burning the transformer on the distribution transformer.
            8. Arrest arresters should be installed on the high and low voltage sides of the distribution transformer.
            Lightning arresters should be installed on the distribution transformers in the multi-mine area. If the quality of the arrester is unqualified or the fault is not replaced in time, it is easy to be attacked by lightning. During the thunderstorm season, the arrester should be sent to the repair department for testing and timely installation. It is forbidden to use unqualified products.
            9. Regularly measure the grounding resistance of the distribution transformer
            After long-term operation of the distribution transformer (especially the grounding lead is replaced by aluminum wire), severe oxidation occurs, the grounding resistance increases, and the buried grounding body is rusted and broken, causing the neutral point potential to shift. When lightning strikes or overvoltages , easy to cause an accident. According to the regulations, the grounding device should meet: the grounding resistance of the distribution transformer below 100kV·A is not more than 10Ω, and the grounding resistance of the distribution transformer above 100kV·A is not more than 4Ω.
            10. Strengthen daily management
            Regularly patrol the line, cut down trees, prevent the branches from hitting the wires and causing a low voltage short circuit to burn the distribution transformer. The lack of daily management of the distribution transformer by the staff makes the transformer run out of oil for a long time. The end of the respirator is installed or the silica gel is not replaced in time, so that the distribution transformer is flooded and easily caused accidents. There are quality problems in the distribution transformer itself. Because the distribution transformer is installed far away, some construction personnel put the untested distribution transformer into operation, temporarily use electricity, and burn out the transformer.
            11, regularly check the distribution transformer low voltage lead
            It is strictly forbidden to use the wire itself to make the wire nose directly on the low-voltage pile head of the distribution transformer. It is necessary to regularly check and strengthen the joint between the lead wire and the distribution transformer pile head to prevent the low-voltage pile head of the distribution transformer from being burnt due to loosening.

            Article keywords:
            Previous article:No last one Next article:What are the functional characteristics ...
            QR code
            主站蜘蛛池模板: 欧美成人在线免费| 国产尤物精品自在拍视频首页| аv天堂最新中文在线| 国产精品粉嫩嫩在线观看| 亚洲人成色7777在线观看不卡| 国产激情电影综合在线看| 91麻豆精品国产91久| 亚洲人成精品久久久久| 国产AV天堂亚洲国产AV天堂| 日韩精品一区二区三区激情视频| 中国国内新视频在线不卡免费看| 精品国际久久久久999波多野| 午夜精品视频在线看| 国产精品呻吟一区二区三区| 亚洲AV成人无码精品电影在线| 国产精品久久久久久久久久久久人四虎 | 久久月本道色综合久久| 久久精品99无色码中文字幕| 日韩V欧美V中文在线| 中文字幕成人精品久久不卡| 午夜在线欧美蜜桃| 97久久精品人人做人人爽| 国产偷国产偷亚洲高清午夜| 天天爽夜夜爽视频精品| 亚洲狠狠婷婷综合久久久| 久久亚洲精品情侣| 欧美熟妇性XXXX欧美熟人多毛| 精品无码老熟妇magnet| 91蜜臀国产自产在线观看| 国产一区二区精品尤物| 亚洲成人免费一级av| 亚洲人成黄网站69影院| 无码熟妇人妻AV在线影片免费| L日韩欧美看国产日韩欧美| 熟妇啊轻点灬大JI巴太粗| 在线看国产精品自拍内射| 亚洲AV无码一二区三区在线播放| 无码精品人妻一区二区三区中| 亚洲第一无码专区天堂| 亚洲欧美日韩第一页| 一个人看的www视频免费观看|