<big id="pyd37"></big>

  1. <tr id="pyd37"><span id="pyd37"></span></tr>

      <kbd id="pyd37"></kbd>
      <abbr id="pyd37"><form id="pyd37"></form></abbr>
            <u id="pyd37"><th id="pyd37"><em id="pyd37"></em></th></u>
            久久午夜私人影院,天堂中文8资源在线8,国产精品成人久久电影,国产午夜福利精品片久久,日本精品不卡一二三区,免费国产一区二区不卡,国产精品亚洲一区二区三区喷水 ,在线a亚洲老鸭窝天堂
            Information
            Hot
            Contact us
            Shanghai Youpeng Electromechanical Equipment Manufacturing Co., Ltd.
            Fax: 021-69024199
            Contact: Mr.Peng 
            Mobile: 15021113195
            E-mail: 502752248@qq.com
            Address: No. 999, Zhongfa Road, Zhujing Town, Jinshan District, Shanghai
            http://www.bbbjiz.cn/

             

            Hunan Peng bathroom safe choice
            Your location:Home>>industry

            11 points that must be paid attention to when installing the transformer

            Release date:2018-12-20 17:13:54

            11 points that must be paid attention to when installing the transformer


            1. Reasonably choose the installation location of the distribution transformer:
            The installation of the distribution transformer should meet the requirements of the user's voltage, and try to avoid installing the distribution transformer in the barren hills, which is vulnerable to lightning strikes and away from the residential area. This is not convenient for the maintenance personnel to maintain regularly, and it is not convenient for the staff to manage. .
            2. Reasonably choose the capacity of the distribution transformer
            It is also very important to choose the capacity of the distribution transformer reasonably, which can not cause the load of the distribution transformer to burn out, nor can it cause the waste of the big horse-drawn trolley type. According to the user load situation, the capacity should be counted and the distribution transformer capacity should be reasonably selected.
            3. Strengthen the measurement of power load
            During the peak period of power load, the load of each distribution transformer should be strengthened. If necessary, increase the number of measurements. The distribution transformer that does not meet the three-phase current should be adjusted in time to prevent the neutral current from being too large and easy to blow the lead. Causes the user equipment to burn out.
            4. Avoid installing a low-voltage metering box on the distribution transformer.
            The low-voltage metering box installed on the distribution transformer station area of ??the remote mountainous area should be gradually removed, and changed to indoor installation as much as possible.
            5, reasonable allocation of distribution transformer high and low temperature melting point electrical melting
            The melt distribution of the high and low voltage fuses of the distribution transformer is unreasonable, which may cause serious overload of the distribution transformer and burn out the distribution transformer. The high and low pressure melt configuration shall be followed by: a fuse body with a capacity of 100 kV·A or less and a fuse body with a rated current of 2.0 to 3.0 times; and a transformer with a capacity of 100 kV·A or more with a melt of 1.5 to 2.0 times the rated current; The low-voltage side fuse should be configured slightly larger than the rated current.
            6, should not adjust the tap changer privately
            Due to the difference in power load between winter and summer, the voltage level is slightly different. In order to meet the voltage demand, some rural electricians randomly adjust the tap changer without performing related tests, causing the tap changer to be out of position, causing phase-to-phase short-circuit and burnout. Electric transformer.
            7, distribution transformer high and low installed insulation cover
            In order to prevent natural disasters and external damage, if necessary, install high and low voltage insulation covers for the narrow roads and forest protection areas to prevent the low voltage short circuit from burning the transformer on the distribution transformer.
            8. Arrest arresters should be installed on the high and low voltage sides of the distribution transformer.
            Lightning arresters should be installed on the distribution transformers in the multi-mine area. If the quality of the arrester is unqualified or the fault is not replaced in time, it is easy to be attacked by lightning. During the thunderstorm season, the arrester should be sent to the repair department for testing and timely installation. It is forbidden to use unqualified products.
            9. Regularly measure the grounding resistance of the distribution transformer
            After long-term operation of the distribution transformer (especially the grounding lead is replaced by aluminum wire), severe oxidation occurs, the grounding resistance increases, and the buried grounding body is rusted and broken, causing the neutral point potential to shift. When lightning strikes or overvoltages , easy to cause an accident. According to the regulations, the grounding device should meet: the grounding resistance of the distribution transformer below 100kV·A is not more than 10Ω, and the grounding resistance of the distribution transformer above 100kV·A is not more than 4Ω.
            10. Strengthen daily management
            Regularly patrol the line, cut down trees, prevent the branches from hitting the wires and causing a low voltage short circuit to burn the distribution transformer. The lack of daily management of the distribution transformer by the staff makes the transformer run out of oil for a long time. The end of the respirator is installed or the silica gel is not replaced in time, so that the distribution transformer is flooded and easily caused accidents. There are quality problems in the distribution transformer itself. Because the distribution transformer is installed far away, some construction personnel put the untested distribution transformer into operation, temporarily use electricity, and burn out the transformer.
            11, regularly check the distribution transformer low voltage lead
            It is strictly forbidden to use the wire itself to make the wire nose directly on the low-voltage pile head of the distribution transformer. It is necessary to regularly check and strengthen the joint between the lead wire and the distribution transformer pile head to prevent the low-voltage pile head of the distribution transformer from being burnt due to loosening.

            Article keywords:
            Previous article:No last one Next article:What are the functional characteristics ...
            QR code
            主站蜘蛛池模板: 一本久道中文无码字幕av| 精品无码av不卡一区二区三区| 18禁无遮挡啪啪无码网站| 亚洲最大日韩精品一区| 91娇喘视频| 日韩不卡一区二区三区四区| 一出一进一爽一粗一大视频| 国产亚洲999精品AA片在线爽| 99RE6在线视频精品免费下载| 花蝴蝶日本高清免费观看| 日韩高清亚洲日韩精品一区二区| 久章草这里只有精品| 午夜精品久久久久久久爽| 久久天天躁综合夜夜黑人鲁色| 久久91综合国产91久久精品| 欧美自拍另类欧美综合图片区| 国产精品推荐一区二区| 国产精品欧美福利久久| 久久99精品久久水蜜桃| 日本一区二区三区有码视频| 欧美亚洲一区二区三区在线| 蜜桃臀av一区二区三区| 亚洲熟妇色xxxxx亚洲| 99国产精品永久免费视频| 久久精品国产亚洲av电影| 国产AV一区二区精品凹凸| 少妇人妻真实偷人精品| 老子午夜精品无码| 国产亚洲精品AA片在线播放天| 星空影院电影电视剧免费播放| 悠悠人体艺术视频在线播放| 亚洲国产成人av在线观看| 日韩精品 在线 国产 丝袜| 国产乱妇乱子在线视频| 女同亚洲精品一区二区三| 成人亚欧欧美激情在线观看| 无码中文字幕久久久久久 | 国产老女人免费观看黄A∨片| 久久精品国产亚洲av大全相关| 国产精品 自在自线| 青青草最新在线视频播放|