• <cite id="x6vkx"><rp id="x6vkx"><form id="x6vkx"></form></rp></cite>
      <sub id="x6vkx"></sub>
      1. 久久午夜私人影院,天堂中文8资源在线8,国产精品成人久久电影,国产午夜福利精品片久久,日本精品不卡一二三区,免费国产一区二区不卡,国产精品亚洲一区二区三区喷水 ,在线a亚洲老鸭窝天堂
        Information
        Hot
        Contact us
        Shanghai Youpeng Electromechanical Equipment Manufacturing Co., Ltd.
        Fax: 021-69024199
        Contact: Mr.Peng 
        Mobile: 15021113195
        E-mail: 502752248@qq.com
        Address: No. 999, Zhongfa Road, Zhujing Town, Jinshan District, Shanghai
        http://www.bbbjiz.cn/

         

        Hunan Peng bathroom safe choice
        Your location:Home>>industry

        11 points that must be paid attention to when installing the transformer

        Release date:2018-12-20 17:13:54

        11 points that must be paid attention to when installing the transformer


        1. Reasonably choose the installation location of the distribution transformer:
        The installation of the distribution transformer should meet the requirements of the user's voltage, and try to avoid installing the distribution transformer in the barren hills, which is vulnerable to lightning strikes and away from the residential area. This is not convenient for the maintenance personnel to maintain regularly, and it is not convenient for the staff to manage. .
        2. Reasonably choose the capacity of the distribution transformer
        It is also very important to choose the capacity of the distribution transformer reasonably, which can not cause the load of the distribution transformer to burn out, nor can it cause the waste of the big horse-drawn trolley type. According to the user load situation, the capacity should be counted and the distribution transformer capacity should be reasonably selected.
        3. Strengthen the measurement of power load
        During the peak period of power load, the load of each distribution transformer should be strengthened. If necessary, increase the number of measurements. The distribution transformer that does not meet the three-phase current should be adjusted in time to prevent the neutral current from being too large and easy to blow the lead. Causes the user equipment to burn out.
        4. Avoid installing a low-voltage metering box on the distribution transformer.
        The low-voltage metering box installed on the distribution transformer station area of ??the remote mountainous area should be gradually removed, and changed to indoor installation as much as possible.
        5, reasonable allocation of distribution transformer high and low temperature melting point electrical melting
        The melt distribution of the high and low voltage fuses of the distribution transformer is unreasonable, which may cause serious overload of the distribution transformer and burn out the distribution transformer. The high and low pressure melt configuration shall be followed by: a fuse body with a capacity of 100 kV·A or less and a fuse body with a rated current of 2.0 to 3.0 times; and a transformer with a capacity of 100 kV·A or more with a melt of 1.5 to 2.0 times the rated current; The low-voltage side fuse should be configured slightly larger than the rated current.
        6, should not adjust the tap changer privately
        Due to the difference in power load between winter and summer, the voltage level is slightly different. In order to meet the voltage demand, some rural electricians randomly adjust the tap changer without performing related tests, causing the tap changer to be out of position, causing phase-to-phase short-circuit and burnout. Electric transformer.
        7, distribution transformer high and low installed insulation cover
        In order to prevent natural disasters and external damage, if necessary, install high and low voltage insulation covers for the narrow roads and forest protection areas to prevent the low voltage short circuit from burning the transformer on the distribution transformer.
        8. Arrest arresters should be installed on the high and low voltage sides of the distribution transformer.
        Lightning arresters should be installed on the distribution transformers in the multi-mine area. If the quality of the arrester is unqualified or the fault is not replaced in time, it is easy to be attacked by lightning. During the thunderstorm season, the arrester should be sent to the repair department for testing and timely installation. It is forbidden to use unqualified products.
        9. Regularly measure the grounding resistance of the distribution transformer
        After long-term operation of the distribution transformer (especially the grounding lead is replaced by aluminum wire), severe oxidation occurs, the grounding resistance increases, and the buried grounding body is rusted and broken, causing the neutral point potential to shift. When lightning strikes or overvoltages , easy to cause an accident. According to the regulations, the grounding device should meet: the grounding resistance of the distribution transformer below 100kV·A is not more than 10Ω, and the grounding resistance of the distribution transformer above 100kV·A is not more than 4Ω.
        10. Strengthen daily management
        Regularly patrol the line, cut down trees, prevent the branches from hitting the wires and causing a low voltage short circuit to burn the distribution transformer. The lack of daily management of the distribution transformer by the staff makes the transformer run out of oil for a long time. The end of the respirator is installed or the silica gel is not replaced in time, so that the distribution transformer is flooded and easily caused accidents. There are quality problems in the distribution transformer itself. Because the distribution transformer is installed far away, some construction personnel put the untested distribution transformer into operation, temporarily use electricity, and burn out the transformer.
        11, regularly check the distribution transformer low voltage lead
        It is strictly forbidden to use the wire itself to make the wire nose directly on the low-voltage pile head of the distribution transformer. It is necessary to regularly check and strengthen the joint between the lead wire and the distribution transformer pile head to prevent the low-voltage pile head of the distribution transformer from being burnt due to loosening.

        Article keywords:
        Previous article:No last one Next article:What are the functional characteristics ...
        QR code
        主站蜘蛛池模板: 超清无码一区二区三区| 久久精品女人的天堂av| 亚洲欧美日韩愉拍自拍美利坚| 国产精品自在线拍国产手机版| аⅴ天堂中文在线网| 亚洲第一视频区| 2021av在线| 久天啪天天久久99久孕妇| 蜜桃视频一区二区在线观看| 欧洲一区二区中文字幕| 午夜精品福利亚洲国产| 亚洲熟女片嫩草影院| 精品人妻伦一二二区久久| 国产精品一级久久黄色片| 亚洲国产精品久久电影欧美 | 国产欧美日韩精品第二区| 久久亚洲日本激情战少妇| 国产精品午夜福利合集| 99久久亚洲综合精品成人网| 国产gaysexchina男外卖| 国产乱码精品一区二区三区四川人| 久久婷婷综合色丁香五月| 国产高清精品一区二区三区| 91福利视频一区二区| 久久99久久99精品免视看国产成人| 最新日韩精品中文字幕| 亚洲国产良家在线观看| 91中文字幕一区二区| 深夜av免费在线观看| 成年女人免费碰碰视频| 久久久精品人妻一区二区三区 | 久久99精品国产99久久6尤物| 狼人大伊人久久一区二区| 久久亚洲精品成人av秋霞| 国产肥妇一区二区熟女精品 | 国产精品青青在线观看爽香蕉| 老色鬼在线精品视频| 色九月亚洲综合网| 婷婷色爱区综合五月激情韩国| 狠狠爱五月丁香亚洲综| 免费人成再在线观看网站|