• <cite id="x6vkx"><rp id="x6vkx"><form id="x6vkx"></form></rp></cite>
      <sub id="x6vkx"></sub>
      1. 久久午夜私人影院,天堂中文8资源在线8,国产精品成人久久电影,国产午夜福利精品片久久,日本精品不卡一二三区,免费国产一区二区不卡,国产精品亚洲一区二区三区喷水 ,在线a亚洲老鸭窝天堂
        Information
        Hot
        Contact us
        Shanghai Youpeng Electromechanical Equipment Manufacturing Co., Ltd.
        Fax: 021-69024199
        Contact: Mr.Peng 
        Mobile: 15021113195
        E-mail: 502752248@qq.com
        Address: No. 999, Zhongfa Road, Zhujing Town, Jinshan District, Shanghai
        http://www.bbbjiz.cn/

         

        Hunan Peng bathroom safe choice
        Your location:Home>>Company dynamics

        Daily maintenance of the transformer!

        Release date:2018-12-20 17:12:31
        In order to protect the insulation performance of the high-voltage generator and the insulating oil installed in the machine head, generally do not open the observation window and loosen the surrounding fixing screws to prevent the oil from absorbing moisture or falling dust and reducing the insulation performance.
         
        2. Check the surrounding lighting, heat dissipation and dust removal equipment of the transformer, and wipe off the dust on the low-frequency toroidal transformer body and the porcelain bottle with a clean cloth.
         
        3. Check the high-voltage side load switch of the transformer to ensure flexible operation, good contact, and lubrication treatment of the transmission part.
         
        4. Pull open the high-voltage grounding knife and check that the grounding is in the disconnected position. Close the high-voltage load switch, let the transformer test run, and remove the high-voltage side identification plate. Pay attention to the high-voltage load switch when disconnecting or closing the transformer. There must be more than two people.
         
        5. When it is necessary to replace the new oil, the local power department should be assisted to check the performance of the new oil, and the insulation strength should be no less than 25000 volts / 2.5 mm; and the oil insulation strength in the combined head should be 30,000 volts / 2.5 mm or more.
         
        6. Measure the insulation resistance of the high and low voltage coils of the transformer (ground and phase) with a 2500V shaker. Confirm that the requirements are met. (At room temperature 30 °C, the high voltage side of the 1OKV ??transformer is greater than 20MΩ, and the low voltage side is greater than 13MΩ. Before the test, it should be connected. Good grounding wire, after the measurement is completed, it should be discharged.
         
        7. The high voltage generator or the combined machine head must have a good grounding wire. Always use an ohmmeter to measure whether the outer casing, the console casing, and the outer grounding wire are conducting, and tighten the grounding bolt.
         
        8. The high voltage generator or the combined machine head must have a good grounding wire. Always use an ohmmeter to measure whether the outer casing, the console casing and the external grounding wire are conducting, and tighten the grounding bolt.

        Article keywords:
        QR code
        主站蜘蛛池模板: 免费看黄片一区二区三区| 国产激情一区二区三区成人| 国产欧美日韩精品丝袜高跟鞋 | 亚洲欧美中文字幕日韩一区二区| 国产一区韩国主播| 亚洲av不卡电影在线网址最新| 国产短视频精品一区二区| 成人午夜免费一区二区三区| 又湿又紧又大又爽A视频男| 偷柏自拍亚洲综合在线| 日本精品不卡一二三区| 日韩女同一区二区三区久久 | 九九热精品在线免费视频| 少妇性bbb搡bbb爽爽爽欧美| 精品无码人妻一区二区三区| 国产欧美日韩高清在线不卡| 污污网站18禁在线永久免费观看 | 国产精品乱一区二区三区| 色欲色香天天天综合网站免费| 亚洲成av人片一区二区| 国产成人一区二区三区免费| 国产亚洲欧洲av综合一区二区三区| 精品国产女同疯狂摩擦2| 久操线在视频在线观看| 国产精品久久中文字幕| 欧美人与禽2o2o性论交| 精品亚洲国产成人痴汉av| 国产熟妇另类久久久久久| 北岛玲中文字幕人妻系列| 久久久久无码精品国产AV| 香蕉在线精品一区二区| 日韩精品久久久肉伦网站| 亚洲av激情一区二区三区| 久久精品国产中文字幕| 成人无号精品一区二区三区| 骚虎视频在线观看| av午夜福利一片免费看久久| 欧美午夜小视频| 免费人欧美成又黄又爽的视频| 99久久国产一区二区三区| 欧美高清狂热视频60一70|