<big id="pyd37"></big>

  1. <tr id="pyd37"><span id="pyd37"></span></tr>

      <kbd id="pyd37"></kbd>
      <abbr id="pyd37"><form id="pyd37"></form></abbr>
            <u id="pyd37"><th id="pyd37"><em id="pyd37"></em></th></u>
            久久午夜私人影院,天堂中文8资源在线8,国产精品成人久久电影,国产午夜福利精品片久久,日本精品不卡一二三区,免费国产一区二区不卡,国产精品亚洲一区二区三区喷水 ,在线a亚洲老鸭窝天堂
            Information
            Hot
            Contact us
            Shanghai Youpeng Electromechanical Equipment Manufacturing Co., Ltd.
            Fax: 021-69024199
            Contact: Mr.Peng 
            Mobile: 15021113195
            E-mail: 502752248@qq.com
            Address: No. 999, Zhongfa Road, Zhujing Town, Jinshan District, Shanghai
            http://www.bbbjiz.cn/

             

            Hunan Peng bathroom safe choice
            Your location:Home>>Company dynamics

            Daily maintenance of the transformer!

            Release date:2018-12-20 17:12:31
            In order to protect the insulation performance of the high-voltage generator and the insulating oil installed in the machine head, generally do not open the observation window and loosen the surrounding fixing screws to prevent the oil from absorbing moisture or falling dust and reducing the insulation performance.
             
            2. Check the surrounding lighting, heat dissipation and dust removal equipment of the transformer, and wipe off the dust on the low-frequency toroidal transformer body and the porcelain bottle with a clean cloth.
             
            3. Check the high-voltage side load switch of the transformer to ensure flexible operation, good contact, and lubrication treatment of the transmission part.
             
            4. Pull open the high-voltage grounding knife and check that the grounding is in the disconnected position. Close the high-voltage load switch, let the transformer test run, and remove the high-voltage side identification plate. Pay attention to the high-voltage load switch when disconnecting or closing the transformer. There must be more than two people.
             
            5. When it is necessary to replace the new oil, the local power department should be assisted to check the performance of the new oil, and the insulation strength should be no less than 25000 volts / 2.5 mm; and the oil insulation strength in the combined head should be 30,000 volts / 2.5 mm or more.
             
            6. Measure the insulation resistance of the high and low voltage coils of the transformer (ground and phase) with a 2500V shaker. Confirm that the requirements are met. (At room temperature 30 °C, the high voltage side of the 1OKV ??transformer is greater than 20MΩ, and the low voltage side is greater than 13MΩ. Before the test, it should be connected. Good grounding wire, after the measurement is completed, it should be discharged.
             
            7. The high voltage generator or the combined machine head must have a good grounding wire. Always use an ohmmeter to measure whether the outer casing, the console casing, and the outer grounding wire are conducting, and tighten the grounding bolt.
             
            8. The high voltage generator or the combined machine head must have a good grounding wire. Always use an ohmmeter to measure whether the outer casing, the console casing and the external grounding wire are conducting, and tighten the grounding bolt.

            Article keywords:
            QR code
            主站蜘蛛池模板: 日本丶国产丶欧美色综合| 日本不卡一区二区三区| 国内熟妇人妻色在线三级| 亚洲VA久久久噜噜噜久久无码| 国产成人亚洲综合色婷婷秒播| 亚洲中文超碰中文字幕| 黄色亚洲一区二区在线观看| 亚洲色一区二区三区四区| 无码伊人66久久大杳蕉网站谷歌 | 中文字幕午夜福利片午夜福利片97| 久久人人爽人人爽人人av| jlzzjlzz全部女高潮| 亚洲av熟女国产一二三| 99久久精品免费看国产电影| 视频一区视频二区视频三| 女人扒开的小泬高潮喷小| 国产精品自拍实拍在线看| 免费无码一区无码东京热| 狠狠亚洲超碰狼人久久| 国产乱子伦视频在线播放| 国产91专区一区二区| 蜜臀av一区二区三区不卡| 真实单亲乱l仑对白视频| 亚洲成亚洲成网| 国产偷国产偷亚洲高清午夜| 久久久久久久久久久久中文字幕| 成人福利国产午夜AV免费不卡在线 | 99热精品毛片全部国产无缓冲| 成年午夜免费韩国做受视频| 日韩东京热一区二区三区| 2020国产成人精品视频| 欧美18videosex性欧美tube1080| 亚洲AV无码乱码在线观看性色扶| 日韩精品国产二区三区| 激情的视频一区二区三区| 婷婷精品国产亚洲AV麻豆不片| 97一期涩涩97片久久久久久久| 在线观看AV永久免费| 99热这里都是国产精品| 欧美性XXXX极品HD欧美风情| 亚洲精品美女一区二区|