<big id="pyd37"></big>

  1. <tr id="pyd37"><span id="pyd37"></span></tr>

      <kbd id="pyd37"></kbd>
      <abbr id="pyd37"><form id="pyd37"></form></abbr>
            <u id="pyd37"><th id="pyd37"><em id="pyd37"></em></th></u>
            久久午夜私人影院,天堂中文8资源在线8,国产精品成人久久电影,国产午夜福利精品片久久,日本精品不卡一二三区,免费国产一区二区不卡,国产精品亚洲一区二区三区喷水 ,在线a亚洲老鸭窝天堂
            Information
            Hot
            Contact us
            Shanghai Youpeng Electromechanical Equipment Manufacturing Co., Ltd.
            Fax: 021-69024199
            Contact: Mr.Peng 
            Mobile: 15021113195
            E-mail: 502752248@qq.com
            Address: No. 999, Zhongfa Road, Zhujing Town, Jinshan District, Shanghai
            http://www.bbbjiz.cn/

             

            Hunan Peng bathroom safe choice
            Your location:Home>>Company dynamics

            Daily maintenance of the transformer!

            Release date:2018-12-20 17:12:31
            In order to protect the insulation performance of the high-voltage generator and the insulating oil installed in the machine head, generally do not open the observation window and loosen the surrounding fixing screws to prevent the oil from absorbing moisture or falling dust and reducing the insulation performance.
             
            2. Check the surrounding lighting, heat dissipation and dust removal equipment of the transformer, and wipe off the dust on the low-frequency toroidal transformer body and the porcelain bottle with a clean cloth.
             
            3. Check the high-voltage side load switch of the transformer to ensure flexible operation, good contact, and lubrication treatment of the transmission part.
             
            4. Pull open the high-voltage grounding knife and check that the grounding is in the disconnected position. Close the high-voltage load switch, let the transformer test run, and remove the high-voltage side identification plate. Pay attention to the high-voltage load switch when disconnecting or closing the transformer. There must be more than two people.
             
            5. When it is necessary to replace the new oil, the local power department should be assisted to check the performance of the new oil, and the insulation strength should be no less than 25000 volts / 2.5 mm; and the oil insulation strength in the combined head should be 30,000 volts / 2.5 mm or more.
             
            6. Measure the insulation resistance of the high and low voltage coils of the transformer (ground and phase) with a 2500V shaker. Confirm that the requirements are met. (At room temperature 30 °C, the high voltage side of the 1OKV ??transformer is greater than 20MΩ, and the low voltage side is greater than 13MΩ. Before the test, it should be connected. Good grounding wire, after the measurement is completed, it should be discharged.
             
            7. The high voltage generator or the combined machine head must have a good grounding wire. Always use an ohmmeter to measure whether the outer casing, the console casing, and the outer grounding wire are conducting, and tighten the grounding bolt.
             
            8. The high voltage generator or the combined machine head must have a good grounding wire. Always use an ohmmeter to measure whether the outer casing, the console casing and the external grounding wire are conducting, and tighten the grounding bolt.

            Article keywords:
            QR code
            主站蜘蛛池模板: 国产亚洲欧美另类一区二区三区| 亚洲一区二区三区在线观看精品中文 | 欧美黑人大战白嫩在线| 日本一区二区三区精品国产| 国产91午夜福利精品| 国产av丝袜旗袍无码网站| 国产成人亚洲老熟女精品| 狠狠干| 插入中文字幕在线一区二区三区| 欧美三级中文字幕在线观看| 国产精品福利在线观看无码卡一| 人妻无码视频一区二区三区| 中文字幕无线码免费人妻| 欧美激情第一欧美在线| 91精品国产一二三产区| 7777精品伊人久久久大香线蕉| 少妇粗大进出白浆嘿嘿视频| 亚洲精品欧美综合二区| 91毛片网| 噜噜综合亚洲av中文无码| 久久精品66免费99精品| 色婷婷日日躁夜夜躁| 欧美成人片在线观看| 四虎国产精品成人免费久久| 台湾佬中文娱乐网22| 丝袜美腿亚洲综合第一页| 成人午夜免费无码视频在线观看| 亚洲精品尤物av在线网站| 婷婷开心色四房播播| 亚洲Av综合日韩精品久久久| 久久精品免费无码区| 国产欧美精品aaaaaa片| 国产在线观看免费人成视频| 小罗莉极品一线天在线| 成年在线观看免费人视频| 中文字幕手机在线看片不卡| 欧美激情一区二区三区成人| 精品无码国产污污污免费| 久热综合在线亚洲精品| 亚洲国产精品乱码一区二区| 精品久久人人做爽综合|