• <cite id="x6vkx"><rp id="x6vkx"><form id="x6vkx"></form></rp></cite>
      <sub id="x6vkx"></sub>
      1. 久久午夜私人影院,天堂中文8资源在线8,国产精品成人久久电影,国产午夜福利精品片久久,日本精品不卡一二三区,免费国产一区二区不卡,国产精品亚洲一区二区三区喷水 ,在线a亚洲老鸭窝天堂
        Information
        Hot
        Contact us
        Shanghai Youpeng Electromechanical Equipment Manufacturing Co., Ltd.
        Fax: 021-69024199
        Contact: Mr.Peng 
        Mobile: 15021113195
        E-mail: 502752248@qq.com
        Address: No. 999, Zhongfa Road, Zhujing Town, Jinshan District, Shanghai
        http://www.bbbjiz.cn/

         

        Hunan Peng bathroom safe choice
        Your location:Home>>Company dynamics

        Daily maintenance of the transformer!

        Release date:2018-12-20 17:12:31
        In order to protect the insulation performance of the high-voltage generator and the insulating oil installed in the machine head, generally do not open the observation window and loosen the surrounding fixing screws to prevent the oil from absorbing moisture or falling dust and reducing the insulation performance.
         
        2. Check the surrounding lighting, heat dissipation and dust removal equipment of the transformer, and wipe off the dust on the low-frequency toroidal transformer body and the porcelain bottle with a clean cloth.
         
        3. Check the high-voltage side load switch of the transformer to ensure flexible operation, good contact, and lubrication treatment of the transmission part.
         
        4. Pull open the high-voltage grounding knife and check that the grounding is in the disconnected position. Close the high-voltage load switch, let the transformer test run, and remove the high-voltage side identification plate. Pay attention to the high-voltage load switch when disconnecting or closing the transformer. There must be more than two people.
         
        5. When it is necessary to replace the new oil, the local power department should be assisted to check the performance of the new oil, and the insulation strength should be no less than 25000 volts / 2.5 mm; and the oil insulation strength in the combined head should be 30,000 volts / 2.5 mm or more.
         
        6. Measure the insulation resistance of the high and low voltage coils of the transformer (ground and phase) with a 2500V shaker. Confirm that the requirements are met. (At room temperature 30 °C, the high voltage side of the 1OKV ??transformer is greater than 20MΩ, and the low voltage side is greater than 13MΩ. Before the test, it should be connected. Good grounding wire, after the measurement is completed, it should be discharged.
         
        7. The high voltage generator or the combined machine head must have a good grounding wire. Always use an ohmmeter to measure whether the outer casing, the console casing, and the outer grounding wire are conducting, and tighten the grounding bolt.
         
        8. The high voltage generator or the combined machine head must have a good grounding wire. Always use an ohmmeter to measure whether the outer casing, the console casing and the external grounding wire are conducting, and tighten the grounding bolt.

        Article keywords:
        QR code
        主站蜘蛛池模板: 久青草国产在视频在线观看| 四川丰满少妇无套内谢| 国产成人精品中文字幕| 中文字幕结果国产精品| 蜜臀91精品高清国产福利| av老司机亚洲精品天堂| 久久99精品国产麻豆婷婷| 99久久99这里只有免费费精品 | 国产成人啪精品午夜网站| 中文国产成人精品久久不卡| 色偷偷亚洲精品一区二区| 精品人妻一区二区三区蜜臀| 国产精品一区二区黄色片| 亚洲精品欧美综合二区| 52熟女露脸国语对白视频| 国产综合色在线精品| 97欧美精品系列一区二区| 精品国产精品中文字幕| 亚洲最大成人av免费看| 女同精品女同系列在线观看| 国产成人久久精品二区三| 久久99精品久久久久久| 亚洲产在线精品亚洲第一站一| 精品熟女日韩中文十区| 中文有无人妻VS无码人妻激烈| 久久精品这里热有精品| 国产迷姦播放在线观看| 日韩有码中文字幕av| 91老肥熟女九色老女人| 亚洲av成人免费在线| 日韩av一区二区三区精品| 任你躁国产自任一区二区三区| 国产熟女av一区二区三区| 国产激情一区二区三区不卡| 亚洲中文精品一区二区| 精品国产成人国产在线视| 亚洲色婷婷一区二区| 7777精品久久久大香线蕉| 50岁熟妇的呻吟声对白| AV老司机色爱区综合| 国产成人一区二区三区免费|